Biomass – Lignite Boiler Plant
Client
MUNICIPAL DISTRICT HEATING COMPANY
OF AMINDEO (D.H.C.A.)
OF AMINDEO (D.H.C.A.)
MEP Design
ALTERTEAM PCC 2010
Project Status
In operation
A biomass – lignite superheated hot water boiler plant to feed the district heating network in Amyntaio.
Engineering Design of a biomass combustion plant for the district heating network of Amyntaio – Filotas, aiming to replace the existing plant of the Public Power Company S.A. serving the settlements of Filota and Leva.
MEP Engineering Design was carried out until the Construction Design phase and included the boilers’ plants with two boilers of 15 MW capacity each, and its infrastructure.
MEP Engineering Design was carried out until the Construction Design phase and included the boilers’ plants with two boilers of 15 MW capacity each, and its infrastructure.